Loading note...
Loading note...

This article was originally written in Spanish.


Italy unlocks a 250 MW offshore wind farm, but auctions are still pending

Mexico adds 447 MW of distributed generation in the first half of 2026 and exceeds 5600 MW of installed capacity

Enel reveals it was preparing a “megabattery” five times larger than what was offered in the Colombian auction: the key points of the project
Make the energy sector know your company.
Give your press releases visibility with a specialized audience and strengthen your company's positioning with Energía Estratégica.